Average sales cycle calculator

Paste closed-won sales cycle lengths to calculate average, median and 90th percentile days. Compare typical deal speed with the long tail of slow sales. Free, no sign-up.

Your inputs

One elapsed duration per won deal. Separate numbers with commas or new lines; up to 500 deals.

Your results

Average
40 days
Median
30 days
90th percentile (nearest rank)
90 days
Measurements
5

Use elapsed calendar days from one consistent start event to closed-won. Open and lost deals are excluded from this sample.

Free, no sign-up. Calculations run in your browser; inputs are not sent to Anvil or saved. Results update as you type.

How the average sales cycle calculator works

Average sales cycle measures elapsed time between a chosen start event and a won deal. A start event might be opportunity creation or qualification, but the definition must stay consistent. This calculator accepts the elapsed day count for each completed win and returns the mean, median and 90th percentile.

The mean includes every day in the sample and is sensitive to unusually slow deals. The median describes the middle observation and can better represent a typical deal. The 90th percentile uses nearest rank: sort the sample and take the observation at the rounded-up 90% position.

Formula

Average cycle = sum of closed-won cycle days ÷ won deals; median = middle sorted duration; P90 = nearest-rank 90th percentile

Worked example

Start with the example inputs below. The calculator opens with these values; reset the example at any time to compare your own scenario.

Example inputs
MeasureValue
Closed-won cycle lengths (days)20, 25, 30, 35, 90
Calculated example results
MeasureValue
Average40 days
Median30 days
90th percentile (nearest rank)90 days
Measurements5

Use elapsed calendar days from one consistent start event to closed-won. Open and lost deals are excluded from this sample.

How to use the result

Export elapsed durations for one segment and a consistent closed-won reporting period. Paste only numbers, separated by commas, spaces or new lines. Compute elapsed calendar days from your timestamps before entry; this tool does not infer working-day calendars or time-zone rules.

Compare the mean with the median before choosing a planning assumption. A much higher mean suggests a long tail of slow deals. Review those deals for procurement delays, stalled decisions or inconsistent start dates rather than assuming every opportunity needs the same time.

Assumptions and common mistakes

Completed wins exclude opportunities still open and deals that were lost. That can make a recent report look faster when slow opportunities have not yet finished. A small sample makes percentiles unstable. The maximum is 500 measurements and each duration must be non-negative.

Frequently asked questions

Should I include lost deals?

This tool models a closed-won cycle. Analyze time to loss separately if you want to inspect qualification efficiency.

Why show the median as well as the average?

A few very slow wins can raise the mean. The median shows the middle deal duration without that same sensitivity.

Keep the records behind your sales metrics together

Manage companies, people, deals and next actions in Anvil, so your team can review the pipeline behind these calculations.

  • No card details
  • Set up in 20 minutes