Free construction estimate template

A construction estimate with phases, materials, permits, and a contingency line already in place. Change the lines and prices, add your logo, and download a PDF.

Estimate

Prepared for

Estimate total

$33,312.00

  • Amount$2,850.00
  • Amount$2,784.00
  • Amount$6,528.00
  • Amount$6,420.00
  • Amount$7,900.00
  • Amount$3,150.00
  • Amount$1,180.00
  • Amount$2,500.00
Subtotal
$33,312.00
Total
$33,312.00

Acceptance

To accept this estimate, sign and return a copy.

Name and signature
Date

Made with the free quote builder at anvilcrm.com

Estimate total

$33,312.00

How to estimate a construction job

Break the job into phases. Estimate site work, foundation, framing, envelope, systems, and finishes one at a time. A phase-by-phase estimate is easier to check, and it becomes your schedule of progress payments.

Price materials from current quotes. Lumber, concrete, and steel prices move every month. Get supplier quotes for the large items, add 5–10% for waste, and keep the valid-until date short (14–30 days) on material-heavy jobs.

Show the contingency as its own line. Older buildings hide rot, wiring, and out-of-level floors. A separate contingency line (often 5–10% of the job) is honest with the client, and the terms can say it is billed only if it is used.

List permits and subcontractors. Permit fees, inspections, and licensed trades such as electrical and plumbing are often where a construction estimate goes wrong. Name each one, so the client sees that it is included.

What a construction estimate should include

The example above has a place for each of these:

  • Your license number and insurance, next to your business details
  • The site address, if it is not the client's mailing address
  • One line for each phase or trade, with quantity and unit
  • Materials as a lot or by unit, with the waste allowance in the price
  • Permits, inspections, and dumpster or waste removal
  • A contingency line, and when you bill it
  • The deposit and the progress payment schedule
  • How changes to the plan are priced (change orders)

For a firm price instead of an estimate, choose Quote in the settings panel. Our quote and estimate guide explains the difference.

Estimate templates for other trades

Each template starts with a worked example for its trade. Your business details carry over between them.

Frequently asked questions

How accurate should a construction estimate be?

A detailed estimate from drawings is usually within 5–10% of the final cost. An early estimate before drawings can be 20–30% out, so say which kind it is in the notes, and send a quote when the plans are final.

Should I show my markup on the estimate?

Most builders do not show overhead and profit as a separate line. Include them in the line prices. If the client asks for a cost-plus job, show the markup as one line and agree it in the terms.

What is the difference between a construction estimate and a bid?

An estimate is your expected cost, and it can change. A bid is a firm price that you submit to win the job, often against other builders. In the builder, choose Quote for a firm bid and Estimate for an expected cost.

How do I handle change orders?

Say in the terms that changes are priced in writing before the work is done. When a change comes, make a new estimate with only the changed lines and the next number, and get it signed.

How do I save my estimate as a PDF?

Select Download PDF. Your browser opens its print window. Choose Save as PDF as the destination, and save. The file takes its name from the estimate number and the customer. The template is free, needs no sign-up, and what you type stays in your browser.

Win more construction jobs

Anvil keeps every estimate as a deal with its value and a follow-up date, and shows the estimates that nobody has touched for 14 days.

  • No card details
  • Set up in 20 minutes